Salem, OR
Project Type: Industrial Manufacturing
Oregon Cascade performed this fast track design-build and engineering of plumbing and HVAC systems that our firm permitted and began installing within weeks of a notice to proceed from the customer. Furthermore, some of the specs were written in Japanese and the language barrier was an initial challenge on this job, solved through the help of an interpreter. The equipment installed in the plant was still in the test stage in Japan. As the testing advanced, it changed the requirements of the plant mid-process. Our proactive design team was able to incorporate these changes on the fly as we installed our mechanical system.